S9 Deployment Acceptance
After S3–S5, use this checklist on site.
9.1 Physical install
- [ ] Install mode matches S4:
- Tilt mount: 2–3 m (typical 2.5 m), 30° down-tilt
- Flat wall mount: typical 1.5 m, 0° down-tilt
- [ ] Height measured to radar center
- [ ] Radar level, no roll
- [ ] Wall plate hole line vertical
- [ ] Bracket secure; cables clear of aperture
- [ ] Bedroom: foot-of-bed side wall, not above headboard
9.2 Coverage
- [ ] Target activity in S2.4 blue zone
- [ ] No new metal/mirror on axis
9.3 Power & LEDs
- [ ] Side or back Type-C, 5V 2A (either port)
- [ ] Waited 1+ minute (S2.3)
- [ ] LEDs per User Setup Guide (power-on & status)
- [ ] LED off when running is normal
9.4 Platform & provisioning
- [ ] Online after provisioning (User Setup Guide)
- [ ] SN (A1W) correct; height & down-tilt match site
- [ ] Position and azimuth set
9.5 Functional check
- [ ] Live / Preview shows data
- [ ] Self-calibration (S5) if needed, then switch off
- [ ] SD card if playback needed
9.6 Result
| Result | Condition |
|---|---|
| Pass | All mandatory items OK |
| Conditional | Physical OK; IT pending |
| Fail | Height/angle/level/bed wall → redo S3/S4 |